Board’s Area and Maps
Watershed Catchment Area draining to and including the District (hectares)
|
64,523 |
Area of the Drainage District (hectares) Dynamic Map
|
35,785 |
31,466 | |
4,319 | |
Designated Wildlife Sites (hectares)
|
450 |
Board’s Infrastructure
Number of Pumping Stations | 15 |
Number of First and Second Line Sluices | 10 |
Number of Other Water Level Control Structures | 15 |
Length of Watercourse (kilometres) * | 598 |
High Priority Watercourses, as defined by the Board (kilometres) | 370 |
Raised Embankments (kilometres) | TBC |
Environment Agency Infrastructure
Main River (tidal and fluvial) (kilometres)
|
34
|
River Raised Embankments (kilometres)
|
34 |
Sea and Tidal Defences (kilometres)
|
20 |
Policy
Asset Prioritisation Criteria
* Adoption and Abandonment Criteria
Cautionary Note
Last Updated: 31 December 2022