Magdalen Fen Strategy Project
Civil Engineering
Magdalen Bridge Outfall
Magdalen High Road, King’s Lynn
Breheny Civil Engineers
Start: May 2025
Completed: August 2025

This area currently drains by a gravity outfall on the western side of the catchment into the Middle Level Commissioners’ Main Drain (MLMD). The MLMD also serves as a navigation channel, which requires it to be held at higher levels, occasionally limiting gravity discharge and increasing flood risk within the Magdalen catchment. The absence of a flap valve on the outfall meant water levels in the MLMD directly influenced catchment levels.
The Magdalen Bridge Outfall Project has installed a new 30-metre culvert with precast inlet and outlet structures fitted with a flap valve and penstock to manage water flow and prevent backflooding.
To ensure ecological compliance, water vole mitigation was undertaken in spring ahead of construction.