May 2025 – Ongoing

Replacement of a 30-metre culvert at Magdalen High Road bridge - Completed August 2025

Replacement of failing asset with a new 0.213 cumec Archimedes screw pump, weedscreen, discharge pipe and flap valve

Upgrade existing pumping station with two new 1.125 cumec fish-friendly pumps with modern motor control centres (MCCs)

The Magdalen Fen catchment forms an important part of the King’s Lynn Internal Drainage Board (IDB) district, encompassing rich agricultural land, rural communities and areas of environmental significance, such as the Wiggenhall St Germans SSSI. The landscape is shaped by its watercourses and drainage networks, which require careful management to protect both people and nature.
The Magdalen Fen Strategy Project is delivering improvements to key drainage assets within two separate catchments:
A study was undertaken to assess the feasibility of combining these two catchments to rationalise assets. However, the works required to increase capacity, including upsizing drains and enlarging culverts along the entire route to Crabbs Pumping Station, rendered this option prohibitively expensive. The catchments will therefore remain independent.
Funding has been secured through an Environment Agency Grant-in-Aid of £3,677,352 and a £220,000 contribution from the Board.

The works consist of
Collectively these assets protect people, property and nature. By replacing infrastructure at the end of its service life, the project will reduce the flood risks and safeguard 119 homes, farmland and local businesses.
Environmental considerations are at the heart of the design. The use of fish-friendly pumps supports river ecology, while ecological surveys, including water vole mitigation, ensure that protected species are not adversely affected.